Inst./Comp. | 9.9.-14.9. | 16.-21.9.24 | 23.-28.9. | 30.9.-5.10.24 | 7.-12.10.24 | 14.-19.10.24 |
IAP |
Wiring Iron kernel of MS (HM Mass Spectrometer - Realization&Testing (aecenar.com))
Marx Generator Design (FreeCAD, LTSpice) Pulsed Power Diode Accelerator (Electron Source) (aecenar.com) LINAC with RF (Pulsed diode accelerator) (Pulsed diode accelerator (aecenar.com)) see also: 837-pulsed-power-diode-accelerator-prototype-electron-source-pdf (aecenar.com) |
Putting Mass Spectrometer Parts on 1 separate stand: Figure 19.1
------------------------------------------
LINAC with RF (Pulsed diode accelerator) see also: 837-pulsed-power-diode-accelerator-prototype-electron-source-pdf (aecenar.com) ----------------- Searching and summary how to achieve UH vacuum with more than one H vacuum pump (HM Mass Spectrometer - Basics (aecenar.com)) Electromagnetic Realization: Documentation (HM Mass Spectrometer - Realization&Testing (aecenar.com)) Testing Electromagnet (1. DC Supply 2. Measuring of B field with Tesla meter) |
Testing and Calibrating Mass Spectrometer (with Vacuum) (Omar, Majd, Abdullah Q.) | LINAC with RF (Pulsed diode accelerator), X-Ray (Laue Diffraction) | ||
ICP |
Design of Pulsed Powered Line Finishing documentation of C++ code (ICF Simulation (aecenar.com)): |
Marx Generator Design (FreeCAD, LTSpice), Pulsed Power Diode Accelerator (Electron Source) (aecenar.com) Generation of light ion beam |
||||
NLAP |
Contract meetings with Mr. Alamadin and Dr. Mohammad Malass Follow up Deddeh project |
Follow up Mirador Project ------------- Follow up Deddeh project (Project Assesment, Project and Cost Plan to give to Owners association) ------------- NLAP-WEDC: Improvement of filter system (E-filter improvement), putting all filters in 1 container, which can be transported [15:11, 14.9.2024] Amro Zawit: ممكن نصنع prototype صغير بالاول حتى نجرب عليه و بقياسات صغيرة ، في حال احتجنا التعديل اكون من السهل التعديل عليها |
NLAP-WEDC: Construction and Realization of a copy of E-filter (Amro) |
|||
ICPT |
Anode and Cathode alloy for ICPT-AP -> next step: Haber-Bosch Fuel Cell Integration and Test (Ali, Abu Omar, Mariam, Razan) Electrolysis Commisioning for Fuel Cell (Ali, Abu Omar, Mariam) -> membrane missing (nafion is not suitable) Electricity Requirements for Multistage (minimum requirement, with solar energy)
|
ICPT-AP with Haber-Bosch: Specification and Detailed Design for small plant (see docx on Haber Bosch (aecenar.com)
Migrating LOX->LN (Mariam)و with fractional distillation |
Hydrogen storage: hydrogen compressor (needed for further work on fuel cell) |
|||
AS-COMSAT |
AS-COMSAT_1 ACS Teststand: Integrating Sun Sensor and Valves (Ahmad Ali) Manufacturing of comb. Chamber and nozzle for orbit change Teststand CNA 3 nodes (CNA with 1 Gateway, 3 nodes, and n mobile users (aecenar.com)) 144 MHz (RF 144 MHz Transceiver Unit Prototype (aecenar.com) ) |
CNA poster ---------- 144 MHz --------- ACS Teststand --------- Orbit Change Teststand: - Um'a of cupper intalling inlet regenrative cooling |
||||
NLAS | Materials&Cost list for Production Line including Containers | |||||
GreenChem |
Acetyl Cloride W.P.
mining |
Aspirin production downstream until available materials |