Weekly TODOs 2024

Inst./Comp. 9.9.-14.9. 16.-21.9.24 23.-28.9. 30.9.-5.10.24 7.-12.10.24 14.-19.10.24
IAP

Wiring Iron kernel of MS (HM Mass Spectrometer - Realization&Testing (aecenar.com))

 

Marx Generator Design (FreeCAD, LTSpice)

Pulsed Power Diode Accelerator (Electron Source) (aecenar.com)

LINAC with RF (Pulsed diode accelerator) (Pulsed diode accelerator (aecenar.com))

see also: 837-pulsed-power-diode-accelerator-prototype-electron-source-pdf (aecenar.com)

Putting Mass Spectrometer Parts on 1 separate stand:

                                   Figure 19.1

------------------------------------------

 

LINAC with RF (Pulsed diode accelerator) 

see also: 837-pulsed-power-diode-accelerator-prototype-electron-source-pdf (aecenar.com)

-----------------

Searching and summary how to achieve UH vacuum with more than one H vacuum pump (HM Mass Spectrometer - Basics (aecenar.com))

Electromagnetic Realization: Documentation (HM Mass Spectrometer - Realization&Testing (aecenar.com)

Testing Electromagnet (1. DC Supply 2. Measuring of B field with Tesla meter)

Testing and Calibrating Mass Spectrometer (with Vacuum) (Omar, Majd, Abdullah Q.)  LINAC with RF (Pulsed diode accelerator), X-Ray (Laue Diffraction)    
ICP

Design of Pulsed Powered Line

Finishing documentation of C++ code (ICF Simulation (aecenar.com)):
1. Theory
2. class diagram
3.sequence diagram
4. poster of simulation

   

Marx Generator Design (FreeCAD, LTSpice), Pulsed Power Diode Accelerator (Electron Source) (aecenar.com)

Generation of light ion beam

     
NLAP

Contract meetings with Mr. Alamadin and Dr. Mohammad Malass

Follow up Deddeh project

Follow up Mirador Project

-------------

Follow up Deddeh project (Project Assesment, Project and Cost Plan to give to Owners association)

-------------

NLAP-WEDC:

Improvement of filter system (E-filter improvement), putting all filters in 1 container, which can be transported 

[15:11, 14.9.2024] Amro Zawit: ممكن نصنع prototype صغير بالاول حتى نجرب عليه و بقياسات صغيرة ، في حال احتجنا التعديل اكون من السهل التعديل عليها
[15:49, 14.9.2024] Amro Zawit: او ندرس الelectrofilter الي عنا اصلا و على اساسه نصنع واحد

 NLAP-WEDC:

Construction and Realization of a copy of E-filter (Amro)

     
ICPT

Anode and Cathode alloy for ICPT-AP

-> next step: Haber-Bosch

Fuel Cell Integration and Test (Ali, Abu Omar, Mariam, Razan)

Electrolysis Commisioning for Fuel Cell (Ali, Abu Omar, Mariam) -> membrane missing (nafion is not suitable)

Electricity Requirements for Multistage (minimum requirement, with solar energy)

 

ICPT-AP with Haber-Bosch: Specification and Detailed Design for small plant (see docx on Haber Bosch (aecenar.com)

 

Migrating LOX->LN (Mariam)و with fractional distillation

 Hydrogen storage: hydrogen compressor

(needed for further work on fuel cell)

     
AS-COMSAT

AS-COMSAT_1 ACS Teststand: Integrating Sun Sensor and Valves (Ahmad Ali)

Manufacturing of comb. Chamber and nozzle for orbit change Teststand 

CNA 3 nodes (CNA with 1 Gateway, 3 nodes, and n mobile users (aecenar.com))

144 MHz (RF 144 MHz Transceiver Unit Prototype (aecenar.com) )

 

 CNA poster

----------

144 MHz

---------

ACS Teststand

---------

Orbit Change Teststand: - Um'a of cupper intalling

inlet

regenrative cooling

     
NLAS  Materials&Cost list for Production Line including Containers          
GreenChem

Acetyl Cloride

W.P.


PCl5

mining

   Aspirin production downstream until available materials