Waste Management Pilot Plant in Assoun/Dinniye - North Lebanon
Kick-off meeting 2.9.22

Biogas & fertilizer productions at Aassoun POSTER (pptx)
Biogas & fertilizer productions at Aassoun POSTER (pdf)
27.9.2025
نقل منظومة NLAP-WEDC من راس مسقا الى عاصون الضنية


28.9.25
الموقع الجديد لإدارة النفايات المنزلية لبلدة عاصون الضنية

2.10.25:


11.10.25:




Commisioning of Incinerator 18.10.25:
aecenar.com/jdownloads/NLAP/WhatsApp Video 2025-10-18 um 14.04.34_5499384d.mp4
https://aecenar.com/jdownloads/NLAP/WhatsApp%20Video%202025-10-18%20um%2014.16.27_0eb3aa80.mp4
Operating per hand at PCS Panel see NLAP-IPP PLC Panel:
| Exhaust Fan at Incinerator | ![]() |
![]() |
| Exhaust Fan at Chimney | ![]() |
![]() |
| AIr Supply Fan (Blue) | ![]() |
|
ونشكر الدكتور اويس على كرمه بعد التشغيل في 18.10.25

13.11.25
band was mounted on organic waste fermenter

16.11.25

Visit from Qalamoun municipality advisor Eng. Abdullah Hammoud to inspect the plant. Alhadulillah it was sucessful. The incineration was in operation without the electrofilter. But it was demonstrated, that even in this case the outcoming flue gas is better than the outcomings of diesel generator in Qalamoun, which is placed in the middle of Qalamoun village.
Plan for Warming Up Digester by Cooling Cycle
Actual: warming up by steam cycle:
1. Dangerous
2. Steam cannot reach 14 bar for necessary turbine inlet pressure - > not possible to run the plant to generate electricity