WHOLE SYSTEME TEST WITH ANOTHER POWER SUPPLY 19.07.2022
tested according to test specification
00004: WHOLE SYSTEME TEST WITH ANOTHER POWER SUPPLY
WHOLE SYSTEME TEST WITH ANOTHER POWER SUPPLY 15.07.2022
Step |
Step Description |
Expected Result |
RESULTS |
Precondition |
System is off |
|
|
THE CHANGING F THE POWER SUPPLY WIT A POWER SUPPLY OF HIGHER VOLTAGE |
Replacing the power supply with the welding machine |
more hydrogene is generated |
positive |
open the valves V1 and V1 |
open the valves V1 and V1 from the GUI |
the valve v1 anv d v2 are open and enable to let the nitrogene gas pass |
positive |
WASH THE SYSTEM WITH NITROGENE |
Wash the system with Nitrogenen for few minutes BY TURNING ON THE VALVE on the nitrogene tank
|
-one can see that there is nitrogene exit from the gas outlets |
positive |
Switch on the system |
Turn off the nitrogene Turn on the systeme from the GUI
|
THE SYSTEM IS GENERATING hydrogene and oxygene |
the systeme is generating hydrogene but not oxygene |
Burn the hydrogene |
Turn on the transformator |
The Hidrogene is burning |
positive |
Switch off the system. |
Switch off the system from thGUI Switch off the transformator
|
The system goes down. |
positive |
WASH THE SYSTEM WITH NITROGENE |
Wash the system with Nitrogenen for few minutes BY TURNING ON THE VALVE on the nitrogene tank
|
All the hydrogene existing in the pipe systeme exeit |
not done yet |
Postcondition |
System off the systeme |
systeme is off |
After replacing the power supply with the welding machine, we were able to generate enough hydrogen to burn it. see the pictures below .