- Hits: 1107
007: Aspirin Pilot Plant flow sensor Test
Step |
Step Description |
Results |
Precondition |
System is OFF |
|
TURNING ON the system |
Turn ON the control panel
|
The system is ON |
Open the valve 6 (tank 3 : HOT WATER) |
Open the valve V6 to add water from HOT WATER TANK (tank 3) to the cooler (tank 2) (HOt WATER TANK---->HOT WATER TANK valve V6) |
-The water is in the cooler (tank 2) -The flow sensor is marking the number of Litres going through (5L) and once we reach 5L the flow sensor will stop and valve 6 will close automatically. |
switching OFF the system |
switch OFF the system |
the system is OFF |
Postcondition |
system is OFF |
video 007: video 3.2 (test 2) flow sensor test in aspirin pilot plant 14/12/2023
1. Turn ON the Valve V6 in HOT WATER TANK (tank 3) to transfer the Distilled Water and the flow sensor start counting quantity of DW in ml
2. When the flow sensor marks 5L the Valve V6 will Turn OFF automatically.