- Hits: 1239
LINAC Test 16.01.23
00001: Ensure complete emptying of air
Step | Step description | Expected result | Result |
precondition | system is off | ||
Switch on the system | turn on the pump | 95% vacuum | Negative |
Having a leak | we found a leak in the anode, the cathode and the joint between the cathode and the pump hose | Seal the leakage places | positive |
Switch Off the system | Turn Off the pump | the pump stops pulling out the air | positive |
Silicon use | Put silicon in places where air leaks | Stop leakage and get 95% vacuum | positive |
Postcondition | System is off |
Analysis of the test results:
When we turned on the pump, we found that the vacuum had not been completed yet, and we knew where the air was leaking.
What we did:
So we sealed the leaks with silicone.