- Hits: 2849
Test 26.04.22
To be tested:
- Waste Inlet (Plastics)
- Condensor Open-Cycle Bypass / Condensor Pressure
Results:
[Figures]
[Comments]
[for a specific load: Pressure over time / voltage stability over time]
- for the first time the 3 phase pump (water tank -> boiler) was running from turbine generator output
- stable electricity at generator output (220V for one phase) for about 2 hours