A+ A A-

Test 26.04.22

To be tested: 

- Waste Inlet (Plastics)

- Condensor Open-Cycle Bypass / Condensor Pressure

Results:

[Figures]

[Comments]

[for a specific load: Pressure over time / voltage stability over time]

- for the first time the 3 phase pump (water tank -> boiler) was running from turbine generator output

- stable electricity at generator output (220V for one phase) for about 2 hours