NLAP Project Mirador Miniye July 2024

Customer Relations and Finance

Presentation Mirador Miniye Waste Management (July 2024) (pptx) (Eng. Ziad Malak)

Offer to Torbol Investors (by Ziad Malak)

Planned Date for Contract: End of Aug 24/Begining of Sep 24

System Design

Waste Sorting Plant

 Mobile Waste Separation Plant (aecenar.com)

Diyala Waste Separation Plant Design (1000 tons/day)

Anaerobic Digestor

 

Incinerator

2 MW / 50 tons per day NLAP-IPP

Waste Inlet

NLAP-IPP 2022 Waste Inlet

Ashes Outlet

NLAP-WEDC System Specification - Posters (aecenar.com)

Incineration Bed

 

Filter System

Offer Aug 24 Waste Incineration Filter System 10 tons per day refused waste (drawing and quotation)

Automation

GUI

PLC