AECENAR
Login
A+ A A-

  • Hits: 3451
  • Print
  • Email

نشاطات لمؤسسات اجنبية في شمال لبنان

activities of foreign institutions in north Lebanon.poster.pdf.     

poster.as.pptx.

activities of foreign institutions in north lebanon.documentation.docx.   

activities of foreign institutions in north lebanon.documentation.pdf.                                                                                  

Activities of foreign institutions in North Lebanon.representation.pptx.

activities of foreign institutions in north lebanon.represention.pdf.

 

  • Home
  • Contact للإتصال
  • Mechanical Components
  • Standards and Norms
  • Safety and Security
    • The work with lead
    • Working with X ray
    • Safety of Electricity
  • Procurement
    • Cubesat Off-the-shelf supplier parts/units
      • OBC Hardware
      • OBC Software
      • OBC Mechanical Design, Irvine
      • OBC (On Board Computer)
      • TT&C and COM Transceivers
      • Satellite Power Supply System (PPS) - Mech
      • Cubesat PSS (Power Supply System)
        • AS-COMSAT_1 PSS Hardware
        • AS-COMSAT_1 PSS Software
      • TT&C Ground Segment
      • Cubesat Ground Support Equipment
      • Cubesat ACS Off-the-shelf parts
    • MEGBI-Suppliers Contacts
  • Training Courses تدريبات
  • Student Projects & Career مشاريع طلابية و فرص عمل
  • Partners
  • Publications منشورات
  • Downloads تحميلات
  • شؤون طلابية للجامعة اللبنانية
  • تصريحا في وسائل الاعلام \ Press Releases
  • مؤتمرات - Conferences
    • AECENAR Conference Aug 2022
  • TECDA
  • MEAE-MEPSA
  • Vision رؤيتنا
  • Institutes&Laboratories مراكز ابحاث و مختبرات
    • Planning & Controlling 2024
      • MEGBI/NLPBI Planning&Controlling 2024
      • Weekly TODOs 2024
    • Documentation/Database Reference
    • MEGBI
      • Lab Scale Penicillin production
        • Penicillin Quantification
        • Penicillin Production and Quantification 2023
      • Pilot Plant Scale Penicillin/Aspirin Production
        • Pilot scale test specification
        • Pilot scale system test
          • WHOLE SYSTEME TEST (AUTOCLAVE TEST) 07/11/2022
          • Aspirin Production System Test (Water test) 28/11/2023
          • Aspirin Production System Test (Water test) 01/12/2023
          • Aspirin Pilot Plant Flow sensor test 6-7/12/2023
          • Aspirin Production System Test (Water test) 14/12/2023
          • Aspirin Pilot Plant Flow sensor test 14/12/2023
          • ASPIRIN PILOT PLANT TEST (AUTOCLAVE TEST) 14/12/2023
          • Aspirin Pilot Plant (Aspirin Production : TEST 1) 08/01/2024
          • ASPIRIN PILOT PLANT TEST (AUTOCLAVE TEST) ASPIRIN PILOT PLANT 29/12/2023
        • Aspirin pilot plant Mechanical Realisation
        • Requirements Aspirin Pilot Plant Production
        • pilot plant system design
        • Cleaning/Tableting/Recycling Pilot plant
        • system desgin/system concept
          • Mechanical design
          • Aspirin/Penicillin PCS Implementation
        • Raw Materials production
      • Lab Scale Ampicillin production
        • Ampicillin trials
        • Amp quantification
        • Ampicillin Production and Quantification May2023
      • Aspirin production
        • Aspirin Identification Tests
      • The most important solutions in biology-lab
      • Ministry of Health license
      • Phenylacetic acid production(PAA-precursor)
        • PAA-Trials
      • Lab Content
    • MEAE
    • IEP
      • إدارة النفايات في شمال لبنان
        • معالجة النفايات في ضهر العين تشرين الاول 2023
        • متطلبات انشاء معمل لفرز النفايات الصلبة
        • وضع المحطة في الضنية - بقاعصفرين (Jul 22 - ...)
          • الصيانة بعد النقل و تجهيز المحطة
          • مشروع ادارة النفايات في بلدية بقاع صفرين
            • Possible land for Biogaz plant
        • SDM-WasteManagementNorthLebanon
        • EIA Waste to Energy Plants in North Lebanon
        • مشروع ازالة جبل النفايات في طرابلس
        • معمل ريمون مِتري في بلاط - جبيل
        • مشروع تنظيف طرابلس
          • المكبات العشوائية في طرابلس
        • ارض الاوقاف في مجدليا مرشحة لوضع المحطة وقسم من المركز
        • حملة لتنظيف الضنية
        • نقل المحطة الى كفرشلان
        • NLAP-IPP at Central Mina next to Masjid as-Salam (Sep 21-Jul 22)
        • Biogas Pilot Plant in Assoun/Dinniye - North Lebanon
          • Assoun Biogas Plant Official Papers
          • EIA assoun project
          • الجدوى الاقتصادية لمشروع الهاضم اللاهوائي
        • Waste Management for Tripoli
        • EIA Ras Nhash
        • EIA Biogas Plants
        • BiogasTest 21.06.2023
        • Jezzine Biogas Plant Proposals
        • Jezzine Biogas & Compost Plant
      • IEP-MEPSA
        • قطاع الطاقة الكهربائية في السعودية
        • Electricity Supply in North Lebanon Region - تغطية لبنان الشمال بالكهرباء
      • SDM-EnergyEconomyIndonesia
      • النظام السياسي في لبنان
      • TrafficManagementSystem
        • برنامج للسكة الحديدية في الشرق الادنى
        • مبادرة اصلاح طريق العمارة عكار
        • Roads repairs cost in North LEBANON
      • Water and Waste Water
      • IEP-UrbanicPlanning
      • نشاطات لمؤسسات اجنبية في شمال لبنان
      • الزراعة في لبنان
        • مشروع زراعة القمح في عكار
      • Telecom
      • الضرائب في لبنان
      • منشئات تابعة للدولة اللبنانية موقوفة حاليا
      • : عقبات اجتماعية
      • وزارات
      • North Lebanon Maps
      • Environmental impact assessment
      • Possible land for Biogaz plant
      • Oil and Gas Reserves in Lebanon
      • Méthanisation: Processus, condition,étapes..
      • مبادرات
        • اصلاح الطرقات وتنظيم إدارة النفايات في منطقة الجامعة اللبنانية في راس مسقا
      • قسم التنظيم المدني
      • قسم جودة التغذية
      • Lebanon economical analysis
      • Pilot Biogas Project
      • Environmental Conference
    • IAP
      • IAP Physics Lab
        • PhysicsLab Initial PCS
        • IAP-XRAMS
          • XRAMS System Concept/Design
            • XRAMS Mechanical Design
            • XRAMS PCS Design
          • XRAMS Realization /Implementation
            • XRAMS Mechanical Realization
            • XRAMS PCS Implementation
          • XRAMS System Test Specification
          • XRAMS System Testing
            • vacuum Test 03.05.23
            • Magnet test 03.05.23
            • vacuum test 09.06.23
            • X Ray Test 03.07.23
            • X Ray Test 17.07.23
            • X ray Test 24.07.23
          • IAP XRAY system requirements
        • Laser Based Flue Gas Detection
          • Laser Gas Detection System Concept/Design
            • Laser Gas Detection Mechanical Design
            • Laser Gas Detection PCS Design
          • Laser Gas Detection System Realization/Implementation
            • Laser Gas Detection Mechanical Realization
            • Laser Gas Detection PCS Implementation
          • Laser Gas Detection System Test Specifications
          • Laser Gas Detection System Testing
        • Flue Gas Analysis with Mass Spectrometry
          • Mass Spectrometry System Concept/Design
            • Mass Spectrometry Mechanical Design
            • Mass Spectrometry PCS Design
          • Mass Spectrometry System Realization /Implementation
            • Mass Spectrometry Mechanical Realization
            • Mass Spectrometry PCS Implementation
          • Mass Spectrometry System Test Specification
          • Mass spectrometer system requirements
          • Mass Spectrometry detector
          • Flue Gas Analysis with Mass Spectrometer (Heavy Metals)
            • HM Mass Spectrometer - Basics
            • HM Mass Spectrometer - System Tests
        • Vacuum pump
        • Linear Accelerator (LINAC)
          • LINAC RF Concept
            • Pulsed diode Mechanical Design
            • Pulsed Diode PCS Design
          • Electron Source
          • Requirements of LINAC with Glass Tube 2022-2023
          • system test specification of LINAC with Glass Tube 2022-2023
          • system test of LINAC with Glass Tube 2022-2023
            • LINAC Vacuum Test 16.01.23
            • LINAC Test 16/01/23
            • LINAC Test 18/01/23
            • LINAC TEST 28/01/23
            • LINAC test 30_01_23
            • LINAC Test 31/01/23
            • LINAC Test 08/02/23
            • LINAC test 10/02/23
            • LINAC Test 03.03.23
          • Pulsed Diode Realization/Implementation
            • Pulsed Diode Mechanical Realization
            • Pulsed Diode PCS Implementation
        • IAP-Cyclotrone
      • IAP Observatory
        • IAP-SRWDA
        • IAP-GAMS
        • IAP-SPECT
        • IAP-IRS
    • ICS
      • Agriculture Surfaces Burn Detection
    • ICPT
      • ICPT-Electrolyser
        • System Concept/ System Design
          • Mechanical Design
          • PCS Design
        • Realization /Implementation
          • Mechanical Realization
          • Process Control System Realization
        • Electrolyser System Test Specification
        • Electrolyser System Test
          • Test 22.06.22 (Hydaulic Test of pipes)
          • Electrolyzer Test 4.7.22
          • Electrolyser whole system Test 04.07.2022
          • KOH pipes systeme test 04.07.2022
          • Electrolyser whole system Test 05.07.2022
          • Electrolyser whole system Test #2 05.07.2022
          • WHOLE SYSTEME TEST WITH ANOTHER POWER SUPPLY 15.07.2022
          • WHOLE SYSTEME TEST WITH WITH ONLY ONE CELL CONNECTED 05.07.2022
          • Test whether the membrane is ruptured 29.07.2022
          • Electrolyser Test 14.11.2022
          • Electrolyzer test 05.05.2023
          • Electrolyzer test 28.06.2023
        • Elektolyser Systeme Requirements
          • Requirements for the multistage electrolyser
        • ICPT-WEDC Testrigs PCS
          • Electrolyzer PLC&Instruments
      • Liquefication of Air and Oxygen
        • ICPT-LOX System Concept/ Design
          • LOX Mechanical Design
          • LOX PCS Design
        • ICPT-LOX System Realization/Implementation
          • LOX Mechanical Realization
          • LOX PCS Implementation
        • ICPT-LOX System Test Specification
        • ICPT-LOX System Test
        • Requirements
        • ICPT LOX Compressor Development
      • ICPT-Ashes Recycling
        • Ashes Recycling System Concept/ Design
          • Ashes Recycling Mechanical Design
          • Ashes Recycling PCS Design
        • Ashes Recycling System Realization
          • Ashes Recycling Mechanical Realization
          • Ashes Recycling PCS Implementation
        • Ashes Recycling System Test Specifications
        • Ashes Recycling System Test
        • Operation of ashes recycling system
        • Requirements
        • synthesis of extractants
        • ICPT - AR _ Test specifications
        • The cost and of the different extractents
      • ICPT-FuelCell
        • Fuel Cell System Concept/ System Design
          • Fuel Cell Mechanical Design
          • Fuel Cell PCS Design
        • Fuel Cell Realization /Implementation
          • Fuel Cell PCS Implementation
        • Fuel Cell System Test Specifications
        • Fuel Cell System Test
        • Fuel Cell Simulation
      • Analytical Chemistry Lab
      • Metallurgical Lab
        • system test specification
        • Metallurgical tests
          • Metallurgical test 1 _ 24.12.2022
          • Metallurgical test 2 _ 31.01.2023
          • Metallurgical test 3_11022023
    • INT
      • Medical Laser Devices
      • AFM
    • ICP
      • CFD NC
      • IAP-SNS
      • IAP-PSC
      • Heat transfer in incineration power plants
  • AECENAR Technology Center مشاريع تكنولوجية تطبيقية
    • MEGBI-VPP / APP
    • IAP-SAT
    • AECENAR Buildings Complex
    • NLAP-WEDC (Waste to Electricity Demonstration Cycle)
      • NLAP-WEDC System Specification - Posters
      • NLAP-IPP (Mechanical Design (CAD))
        • NLAP-IPP Incineration Chamber Design (CAD)
        • NLAP-IPP Filtersystem Design (CAD)
          • NLAP-IPP Electrofilter Design (CAD)
        • NLAP_IPP Waste Inlet New Design (CAD)
      • NLAP-IPP (Mechanical Realization)
        • NLAP-IPP Chemical Filter (Realization)
        • NLAP-IPP Sieve Filter
        • Condenser
          • Steam piping direction modification (coming from condenser and turbine)
        • Electrofilter product From Chinese Supplier
        • NLAP-IPP Flow gas system (Realization)
        • ultrasonic Nozzles for Exhaust gas cooling
      • NLAP-IPP PCS
        • NLAP-IPP PCS - PLC Program and Instruments
          • NLAP-IPP PLC Panel
          • NLAP-IPP Turbine Govering System (TGS)
          • NLAP-IPP Boiler Pressure Control (BPC)
        • NLAP-IPP PCS GUI
      • NLAP-IPP System Test Cases (System Test Specifications)
      • NLAP-IPP System Tests
        • Test 26.04.22
        • Electrofilter Test 23.05.22
        • Chemical Filter Test 17.06.22
        • Cyclone test after the modification 21.06.22
        • Sieve Filter First Test 02-07-22
        • Test 26-5-2022 / Doniyye-Bikasefrin
        • Test 11-8-2022 / Doniyye-Bikasefrin
        • Test 01.09.2023 - Ras Maska
        • Filtration test ( 18.12.2023)
        • Flue Gas into Water test 12.06.2024
      • متطلبات نقل المحطة
      • صيانة المحطة بعد النقل الى الضنية و تجهيزها للعمل
      • Mobile Waste Separation Plant
      • Mobile Biogas Generation and Gas Turbine Testrig
        • Biogas production from municipal waste
          • ICPT_ Biogas Test Specification
          • system concept / system design
            • Ras Maska Biogas Prototype Reactor - Design
          • Ras Maska Biogas Prototype Reactor - Mechanical Realization
          • Biogas PCS implementation
          • ICPT - Biogas Purification
            • ICPT-Biogas Purification _ Test specification
            • ICPT-Biogas Purification _ Requirements
            • ICPT-Biogas Purification _ System concept
            • ICPT-Biogas Purification _Mechanical design
            • ICPT-Biogas Purification _Mechanical realization/Implementation
          • ICPT-Biogas tests
            • ICPT-Biogas test1_26062023: Digester process
            • ICPT-Biogas test 3_22082023: Digester leakage's test
            • ICPT-Biogas test 5_18012024:Enhancing Methane storage through Gas Compression part 2
      • Pilot Project NLAP Power.plant
  • AECENAR Research Center مشاريع ابحاث

Joomla Templates & WordPress Themes - GavickPro

Menu
  • Login