AECENAR
Login
A+ A A-

  • Hits: 1693
  • Print
  • Email

Lithium-Ion Batteries and BMS

Manufacturing prototype of battery lithium ion (Report 2017 by Siham Aisha) 

 

Lithium-Ion Batteries by Ahmad Dannawi (docx) 

 

 

 

 

  • Home
  • Contact للإتصال
  • Mechanical Components
  • Standards and Norms
  • Safety and Security
    • The work with lead
    • Working with X ray
    • Safety of Electricity
  • Procurement
    • Cubesat Off-the-shelf supplier parts/units
      • OBC Hardware
      • OBC Software
      • OBC Mechanical Design, Irvine
      • OBC (On Board Computer)
      • TT&C and COM Transceivers
      • Satellite Power Supply System (PPS) - Mech
      • Cubesat PSS (Power Supply System)
        • AS-COMSAT_1 PSS Hardware
        • AS-COMSAT_1 PSS Software
      • TT&C Ground Segment
      • Cubesat Ground Support Equipment
      • Cubesat ACS Off-the-shelf parts
    • MEGBI-Suppliers Contacts
  • Training Courses تدريبات
  • Student Projects & Career مشاريع طلابية و فرص عمل
  • Partners
  • Publications منشورات
  • Downloads تحميلات
  • شؤون طلابية للجامعة اللبنانية
  • تصريحا في وسائل الاعلام \ Press Releases
  • مؤتمرات - Conferences
    • AECENAR Conference Aug 2022
  • TECDA
  • MEAE-MEPSA
  • Vision رؤيتنا
  • Institutes&Laboratories مراكز ابحاث و مختبرات
    • Planning & Controlling 2024
      • MEGBI/NLPBI Planning&Controlling 2024
      • Weekly TODOs 2024
    • Documentation/Database Reference
    • MEGBI
      • Lab Scale Penicillin production
        • Penicillin Quantification
        • Penicillin Production and Quantification 2023
      • Pilot Plant Scale Penicillin/Aspirin Production
        • Pilot scale test specification
        • Pilot scale system test
          • WHOLE SYSTEME TEST (AUTOCLAVE TEST) 07/11/2022
          • Aspirin Production System Test (Water test) 28/11/2023
          • Aspirin Production System Test (Water test) 01/12/2023
          • Aspirin Pilot Plant Flow sensor test 6-7/12/2023
          • Aspirin Production System Test (Water test) 14/12/2023
          • Aspirin Pilot Plant Flow sensor test 14/12/2023
          • ASPIRIN PILOT PLANT TEST (AUTOCLAVE TEST) 14/12/2023
          • Aspirin Pilot Plant (Aspirin Production : TEST 1) 08/01/2024
          • ASPIRIN PILOT PLANT TEST (AUTOCLAVE TEST) ASPIRIN PILOT PLANT 29/12/2023
        • Aspirin pilot plant Mechanical Realisation
        • Requirements Aspirin Pilot Plant Production
        • pilot plant system design
        • Cleaning/Tableting/Recycling Pilot plant
        • system desgin/system concept
          • Mechanical design
          • Aspirin/Penicillin PCS Implementation
        • Raw Materials production
      • Lab Scale Ampicillin production
        • Ampicillin trials
        • Amp quantification
        • Ampicillin Production and Quantification May2023
      • Aspirin production
        • Aspirin Identification Tests
      • The most important solutions in biology-lab
      • Ministry of Health license
      • Phenylacetic acid production(PAA-precursor)
        • PAA-Trials
      • Lab Content
    • MEAE
    • IEP
      • إدارة النفايات في شمال لبنان
        • معالجة النفايات في ضهر العين تشرين الاول 2023
        • متطلبات انشاء معمل لفرز النفايات الصلبة
        • وضع المحطة في الضنية - بقاعصفرين (Jul 22 - ...)
          • الصيانة بعد النقل و تجهيز المحطة
          • مشروع ادارة النفايات في بلدية بقاع صفرين
            • Possible land for Biogaz plant
        • SDM-WasteManagementNorthLebanon
        • EIA Waste to Energy Plants in North Lebanon
        • مشروع ازالة جبل النفايات في طرابلس
        • معمل ريمون مِتري في بلاط - جبيل
        • مشروع تنظيف طرابلس
          • المكبات العشوائية في طرابلس
        • ارض الاوقاف في مجدليا مرشحة لوضع المحطة وقسم من المركز
        • حملة لتنظيف الضنية
        • نقل المحطة الى كفرشلان
        • NLAP-IPP at Central Mina next to Masjid as-Salam (Sep 21-Jul 22)
        • Biogas Pilot Plant in Assoun/Dinniye - North Lebanon
          • Assoun Biogas Plant Official Papers
          • EIA assoun project
          • الجدوى الاقتصادية لمشروع الهاضم اللاهوائي
        • Waste Management for Tripoli
        • EIA Ras Nhash
        • EIA Biogas Plants
        • BiogasTest 21.06.2023
        • Jezzine Biogas Plant Proposals
        • Jezzine Biogas & Compost Plant
      • IEP-MEPSA
        • قطاع الطاقة الكهربائية في السعودية
        • Electricity Supply in North Lebanon Region - تغطية لبنان الشمال بالكهرباء
      • SDM-EnergyEconomyIndonesia
      • النظام السياسي في لبنان
      • TrafficManagementSystem
        • برنامج للسكة الحديدية في الشرق الادنى
        • مبادرة اصلاح طريق العمارة عكار
        • Roads repairs cost in North LEBANON
      • Water and Waste Water
      • IEP-UrbanicPlanning
      • نشاطات لمؤسسات اجنبية في شمال لبنان
      • الزراعة في لبنان
        • مشروع زراعة القمح في عكار
      • Telecom
      • الضرائب في لبنان
      • منشئات تابعة للدولة اللبنانية موقوفة حاليا
      • : عقبات اجتماعية
      • وزارات
      • North Lebanon Maps
      • Environmental impact assessment
      • Possible land for Biogaz plant
      • Oil and Gas Reserves in Lebanon
      • Méthanisation: Processus, condition,étapes..
      • مبادرات
        • اصلاح الطرقات وتنظيم إدارة النفايات في منطقة الجامعة اللبنانية في راس مسقا
      • قسم التنظيم المدني
      • قسم جودة التغذية
      • Lebanon economical analysis
      • Pilot Biogas Project
      • Environmental Conference
    • IAP
      • IAP Physics Lab
        • PhysicsLab Initial PCS
        • IAP-XRAMS
          • XRAMS System Concept/Design
            • XRAMS Mechanical Design
            • XRAMS PCS Design
          • XRAMS Realization /Implementation
            • XRAMS Mechanical Realization
            • XRAMS PCS Implementation
          • XRAMS System Test Specification
          • XRAMS System Testing
            • vacuum Test 03.05.23
            • Magnet test 03.05.23
            • vacuum test 09.06.23
            • X Ray Test 03.07.23
            • X Ray Test 17.07.23
            • X ray Test 24.07.23
          • IAP XRAY system requirements
        • Laser Based Flue Gas Detection
          • Laser Gas Detection System Concept/Design
            • Laser Gas Detection Mechanical Design
            • Laser Gas Detection PCS Design
          • Laser Gas Detection System Realization/Implementation
            • Laser Gas Detection Mechanical Realization
            • Laser Gas Detection PCS Implementation
          • Laser Gas Detection System Test Specifications
          • Laser Gas Detection System Testing
        • Flue Gas Analysis with Mass Spectrometry
          • Mass Spectrometry System Concept/Design
            • Mass Spectrometry Mechanical Design
            • Mass Spectrometry PCS Design
          • Mass Spectrometry System Realization /Implementation
            • Mass Spectrometry Mechanical Realization
            • Mass Spectrometry PCS Implementation
          • Mass Spectrometry System Test Specification
          • Mass spectrometer system requirements
          • Mass Spectrometry detector
          • Flue Gas Analysis with Mass Spectrometer (Heavy Metals)
            • HM Mass Spectrometer - Basics
            • HM Mass Spectrometer - System Tests
        • Vacuum pump
        • Linear Accelerator (LINAC)
          • LINAC RF Concept
            • Pulsed diode Mechanical Design
            • Pulsed Diode PCS Design
          • Electron Source
          • Requirements of LINAC with Glass Tube 2022-2023
          • system test specification of LINAC with Glass Tube 2022-2023
          • system test of LINAC with Glass Tube 2022-2023
            • LINAC Vacuum Test 16.01.23
            • LINAC Test 16/01/23
            • LINAC Test 18/01/23
            • LINAC TEST 28/01/23
            • LINAC test 30_01_23
            • LINAC Test 31/01/23
            • LINAC Test 08/02/23
            • LINAC test 10/02/23
            • LINAC Test 03.03.23
          • Pulsed Diode Realization/Implementation
            • Pulsed Diode Mechanical Realization
            • Pulsed Diode PCS Implementation
        • IAP-Cyclotrone
      • IAP Observatory
        • IAP-SRWDA
        • IAP-GAMS
        • IAP-SPECT
        • IAP-IRS
    • ICS
      • Agriculture Surfaces Burn Detection
    • ICPT
      • ICPT-Electrolyser
        • System Concept/ System Design
          • Mechanical Design
          • PCS Design
        • Realization /Implementation
          • Mechanical Realization
          • Process Control System Realization
        • Electrolyser System Test Specification
        • Electrolyser System Test
          • Test 22.06.22 (Hydaulic Test of pipes)
          • Electrolyzer Test 4.7.22
          • Electrolyser whole system Test 04.07.2022
          • KOH pipes systeme test 04.07.2022
          • Electrolyser whole system Test 05.07.2022
          • Electrolyser whole system Test #2 05.07.2022
          • WHOLE SYSTEME TEST WITH ANOTHER POWER SUPPLY 15.07.2022
          • WHOLE SYSTEME TEST WITH WITH ONLY ONE CELL CONNECTED 05.07.2022
          • Test whether the membrane is ruptured 29.07.2022
          • Electrolyser Test 14.11.2022
          • Electrolyzer test 05.05.2023
          • Electrolyzer test 28.06.2023
        • Elektolyser Systeme Requirements
          • Requirements for the multistage electrolyser
        • ICPT-WEDC Testrigs PCS
          • Electrolyzer PLC&Instruments
      • Liquefication of Air and Oxygen
        • ICPT-LOX System Concept/ Design
          • LOX Mechanical Design
          • LOX PCS Design
        • ICPT-LOX System Realization/Implementation
          • LOX Mechanical Realization
          • LOX PCS Implementation
        • ICPT-LOX System Test Specification
        • ICPT-LOX System Test
        • Requirements
        • ICPT LOX Compressor Development
      • ICPT-Ashes Recycling
        • Ashes Recycling System Concept/ Design
          • Ashes Recycling Mechanical Design
          • Ashes Recycling PCS Design
        • Ashes Recycling System Realization
          • Ashes Recycling Mechanical Realization
          • Ashes Recycling PCS Implementation
        • Ashes Recycling System Test Specifications
        • Ashes Recycling System Test
        • Operation of ashes recycling system
        • Requirements
        • synthesis of extractants
        • ICPT - AR _ Test specifications
        • The cost and of the different extractents
      • ICPT-FuelCell
        • Fuel Cell System Concept/ System Design
          • Fuel Cell Mechanical Design
          • Fuel Cell PCS Design
        • Fuel Cell Realization /Implementation
          • Fuel Cell PCS Implementation
        • Fuel Cell System Test Specifications
        • Fuel Cell System Test
        • Fuel Cell Simulation
      • Analytical Chemistry Lab
      • Metallurgical Lab
        • system test specification
        • Metallurgical tests
          • Metallurgical test 1 _ 24.12.2022
          • Metallurgical test 2 _ 31.01.2023
          • Metallurgical test 3_11022023
    • INT
      • Medical Laser Devices
      • AFM
    • ICP
      • CFD NC
      • IAP-SNS
      • IAP-PSC
      • Heat transfer in incineration power plants
  • AECENAR Technology Center مشاريع تكنولوجية تطبيقية
    • MEGBI-VPP / APP
    • IAP-SAT
    • AECENAR Buildings Complex
    • NLAP-WEDC (Waste to Electricity Demonstration Cycle)
      • NLAP-WEDC System Specification - Posters
      • NLAP-IPP (Mechanical Design (CAD))
        • NLAP-IPP Incineration Chamber Design (CAD)
        • NLAP-IPP Filtersystem Design (CAD)
          • NLAP-IPP Electrofilter Design (CAD)
        • NLAP_IPP Waste Inlet New Design (CAD)
      • NLAP-IPP (Mechanical Realization)
        • NLAP-IPP Chemical Filter (Realization)
        • NLAP-IPP Sieve Filter
        • Condenser
          • Steam piping direction modification (coming from condenser and turbine)
        • Electrofilter product From Chinese Supplier
        • NLAP-IPP Flow gas system (Realization)
        • ultrasonic Nozzles for Exhaust gas cooling
      • NLAP-IPP PCS
        • NLAP-IPP PCS - PLC Program and Instruments
          • NLAP-IPP PLC Panel
          • NLAP-IPP Turbine Govering System (TGS)
          • NLAP-IPP Boiler Pressure Control (BPC)
        • NLAP-IPP PCS GUI
      • NLAP-IPP System Test Cases (System Test Specifications)
      • NLAP-IPP System Tests
        • Test 26.04.22
        • Electrofilter Test 23.05.22
        • Chemical Filter Test 17.06.22
        • Cyclone test after the modification 21.06.22
        • Sieve Filter First Test 02-07-22
        • Test 26-5-2022 / Doniyye-Bikasefrin
        • Test 11-8-2022 / Doniyye-Bikasefrin
        • Test 01.09.2023 - Ras Maska
        • Filtration test ( 18.12.2023)
        • Flue Gas into Water test 12.06.2024
      • متطلبات نقل المحطة
      • صيانة المحطة بعد النقل الى الضنية و تجهيزها للعمل
      • Mobile Waste Separation Plant
      • Mobile Biogas Generation and Gas Turbine Testrig
        • Biogas production from municipal waste
          • ICPT_ Biogas Test Specification
          • system concept / system design
            • Ras Maska Biogas Prototype Reactor - Design
          • Ras Maska Biogas Prototype Reactor - Mechanical Realization
          • Biogas PCS implementation
          • ICPT - Biogas Purification
            • ICPT-Biogas Purification _ Test specification
            • ICPT-Biogas Purification _ Requirements
            • ICPT-Biogas Purification _ System concept
            • ICPT-Biogas Purification _Mechanical design
            • ICPT-Biogas Purification _Mechanical realization/Implementation
          • ICPT-Biogas tests
            • ICPT-Biogas test1_26062023: Digester process
            • ICPT-Biogas test 3_22082023: Digester leakage's test
            • ICPT-Biogas test 5_18012024:Enhancing Methane storage through Gas Compression part 2
      • Pilot Project NLAP Power.plant
  • AECENAR Research Center مشاريع ابحاث

Joomla Templates & WordPress Themes - GavickPro

Menu
  • Login